Initial assumptionEvery weight, radius and threshold on this page is an initial engineering assumption chosen for this project. None is a validated municipal standard. They are kept in configuration so that an operating organisation can review and change them.
Crew assignment
A crew can take an incident only if its specialisation is qualified for the category, it is marked available, and it is below its capacity. Crews that cannot take a job are still listed for the coordinator with the reason.
Each available crew offers one slot for each unit of free capacity. Taking a later slot means waiting behind the jobs ahead of it. For an incident placed in a slot:
wait = travel time + jobs ahead × 90 min
travel time = straight-line distance from crew base ÷ 30 km/h
cost = priority weight × wait
The priority weights are 8 for Critical, 4 for High, 2 for Moderate and 1 for Low or Awaiting review. Leaving an incident unassigned is charged as a wait of 7 days, so an incident is left out only when no qualified slot is free.
Civitas finds the pairing of incidents to slots with the lowest total cost using the Hungarian algorithm, a standard exact method for minimum-cost assignment. The coordinator sees the reasons for each pairing: the qualification, the distance and assumed travel time, and the number of jobs ahead.
Illustration (invented numbers): a High priority incident 3 km in a straight line from a crew base, with one job ahead of it. Travel time = 3 ÷ 30 × 60 = 6 minutes, wait = 6 + 90 = 96 minutes, cost = 4 × 96 = 384.
Comparison with first-in, first-out
The same incidents and crews can be planned with a simple baseline: incidents are taken strictly in the order they were reported, and each goes to the qualified, available crew with the shortest queue. Priority and distance are ignored. Both plans are then shown with the same measures: assignments made, incidents left unassigned, total priority-weighted waiting time, total straight-line distance, coverage by priority band and workload by crew.
What the plan is not
- It is optimal only for the cost model above. It is not a vehicle-routing solution.
- Distance is straight-line from the crew's base, not distance by road.
- Every job is assumed to take the same time, and jobs are not chained into routes.
- It is a recommendation. Nothing is assigned until a coordinator approves it, and the crew can decline.
Initial assumptionThe 30 km/h average speed, 90 minutes per job, the priority weights and the 7-day penalty are assumed values, not measurements.